Product Detail :
|
Construction, redevelopment of the gogo hydropower plant (energy generation)
|
| Tender Detail : |
Tenders Are Invited for Construction, Redevelopment of the Gogo Hydropower Plant (energy Generation) 8.6mw Gogo Hydropower Plant Redevelopment Project Requested Services:
redevelopment of the Gogo Hydropower Plant to Achieve a Capacity of 8.6 Mw, Inter Alia By
1. Desilting the Dam
2. Diverting the Waterflow to Facilitate Works on the Dam and Bottom of the Ground Outlet, Spillway, Intake, and
E-flow Turbine
3. Refurbishing the Existing Spillway Installation of Auxiliary Gates to Increase Level of Reservoir
4. Installing New Spillway Gates with Flaps, Ecological Flow Turbine, Bottom Outlet and New Intake Structures And
Associated Hydro Electro-mechanical Equipment
5. Constructing a New Waterway; Tunnel Measuring Approximate 440m in Length and 3.6m in Diameter, Including
the Surge Tank and Associated Facilities
6. Constructing a New Steel Penstock Complete with Bifurcation; Length: Approximate 85m
7. Constructing a New Powerhouse Equipped with Turbines with An Installed Capacity of at Least 8.6mw, Generators,
Transformers, Tailrace, Controls and Protection, and All Associated Auxiliary and Ancillary Equipment
8. Constructing a New 11/33 Kv Substation and 33kv Dedicated Power Evacuation Line Measuring Approximately
26km
9. Executing All the Associated Civil and Structural Works Related to This Project
10. Decommissioning, Closing, and Securing the Existing Hydropower Structures |