Product Detail :
|
Construction of 70 houses in okahao 20. remove trees exceeding 100mm thick, grub up all roots, and
remove from site. excavate in soft material to open face to reduce levels over site for a depth not exceeding 750mm deep including cutting into corners and forming to slopes, embankments, etc. and deposit on site in stockpiles. extra over item 2.2 for excavations being in intermediate excavation material in lieu of in soft material. excavate and remove anthill and fill back and compact etc.
|
Tender Detail : |
Please refer tender notice/documents for more details. |