|
Product Detail :
|
supply of 8350 tons of UIC 60 (60E1) rails, distributed as follows Lot No. 01 2350 tons of rails, intended for the Algiers Metro integrated system extension project El Harrach – Airport. Lot No. 02 6000 tons of rails, intended for the Ksar El Boukhari – Boughezoul railway line project.
|
| Tender Detail : |
Tender Are Invited For supply of: 8350 tons of UIC 60 (60E1) rails, distributed as follows: Lot No. 01: 2350 tons of rails, intended for the Algiers Metro integrated system extension project: El Harrach – Airport. Lot No. 02: 6000 tons of rails, intended for the Ksar El Boukhari – Boughezoul railway line project. |