Product Detail :
|
First and Fifth Avenue Storm Water Drainage Construction Within Matsapha.
|
Tender Detail : |
The works consist of stormwater drainage, subsurface drainage a reshaping and grassing existing unlined drains of Fist and Fifth Avenue. It will involve construction of lined stormwater drains, repairs and rehabilitation of existing stormwater drainage structure, construction of subsurface drain along the roads and landscaping. |