Product Detail :
|
Complete design and construction of Igdir Wastewater Treatment Plant, Construction of Igdir Wastewater Collection System, implemented under FIDIC conditions of contract for plant and design-build (Yellow book, First Edition 1999), design and build of approximately 21,000 m3/d average flow rate capacity wastewater, Treatment plant, design and build of approximately 140 m, 1 000 mm diameter reinforced concrete collector, 24 months supervision of operation after taking over, the works will be implemented under FIDIC conditions of contract for construction for building and engineering works designed by the employer (Red Book, First Edition 1999).
|
Tender Detail : |
for More Information Please See the Tender Notice. |